Boiler Heat Transfer Train / Tube Bank
Feedwater heater — receives subcooled liquid water from the Deaerator via the high-pressure feed pump, heats it before the drum. Same Zukauskas gas-side convection and Hottel radiation engine as Screen Tube; tube side is single-phase liquid water (IAPWS Region 1), Dittus-Boelter, no boiling. Outlet temperature is solved from energy balance + pressure drop (like Superheater), not assumed. Wall temperature uses the real reference formula: average bulk water temperature + 30°C margin (no saturation temperature to anchor to, unlike the boiling sections).
What this answers: How much tube surface is needed to preheat feedwater with leftover flue gas heat before it reaches the drum.
The numbers already in the fields are a complete, working example — not a template you must match. Overwrite any of them with your own design's values; the results update as you type.
Unfamiliar term? Look for a ? next to a field label, or browse the full Glossary.
Quick reaction — was this calculator useful?
Was this calculator useful? Tell us what's missing or what you'd like to see next.