Boiler Heat Transfer Train / Tube Bank
A tubular air preheater with the physics flipped from every other tube-bank module: flue gas flows INSIDE the tubes (Dittus-Boelter convection + in-pipe Hottel radiation), while combustion air flows OUTSIDE in crossflow (same Zukauskas engine as Screen Tube/Superheater, applied to air instead of flue gas). No phase change on either side. The overall U formula keeps flue gas as the unscaled first term and air as the Ao/Ai-scaled term — the same convention used everywhere else in this project, even though the physical inside/outside has swapped.
What this answers: How much tube surface an air preheater needs to warm combustion air using the last heat left in the flue gas, before it goes to the stack.
The numbers already in the fields are a complete, working example — not a template you must match. Overwrite any of them with your own design's values; the results update as you type.
Unfamiliar term? Look for a ? next to a field label, or browse the full Glossary.
Quick reaction — was this calculator useful?
Was this calculator useful? Tell us what's missing or what you'd like to see next.